Location: 1200 Robert T. Longway Blvd, Flint, MI 48503
Services: Plan and Spec
Phase #2 was a new 50,000 sq. ft. school addition in Flint, built in conjuncture with E&L Construction. This plan and spec project was the 2nd phase of 3 total, in building the new Flint Cultural Center School.